- Joined
- Mar 24, 2009
- Messages
- 16,743
Harsh winter leading to delays on construction sites
TORONTO – The harsh winter dealt a severe blow to Ontario’s construction industry as it kept workers out of the cold and away from the job.
Alan Vhinat, the senior vice-president of highrises at Great Gulf, said the high winds and low temperatures have forced his teams to take more time off from building the 76 storey condo at One Bloor East.
Read the full article here.
TORONTO – The harsh winter dealt a severe blow to Ontario’s construction industry as it kept workers out of the cold and away from the job.
Alan Vhinat, the senior vice-president of highrises at Great Gulf, said the high winds and low temperatures have forced his teams to take more time off from building the 76 storey condo at One Bloor East.
Read the full article here.